View Issue Details

IDProjectCategoryView StatusLast Update
0003359PathBugpublic2018-03-08 11:30
Reportersliptonic Assigned Tosliptonic  
PrioritynormalSeverityminorReproducibilityalways
Status closedResolutionfixed 
Product Version0.17 
Target Version0.17 
Summary0003359: Simulation of Jobs other than the first use wrong stock
DescriptionIf a job is created and operations added, it can be simulated correctly.
If a second job is added with its own operations, the simulation will use the stock for the first job.
Steps To ReproduceCreate a job, add operations.
Create s second job, add an operation

Select the second job and click the simulate button.

The stock is the first job stock.
Additional Informationhttps://forum.freecadweb.org/viewtopic.php?f=15&t=24422&start=130#p217773
TagsNo tags attached.
FreeCAD Information

Issue History

Date Modified Username Field Change
2018-03-01 16:02 sliptonic New Issue
2018-03-08 11:30 wmayer Assigned To => sliptonic
2018-03-08 11:30 wmayer Status new => closed
2018-03-08 11:30 wmayer Resolution open => fixed
2018-03-08 11:30 wmayer Note Added: 0011021